处理 SSI 文件时出错
处理 SSI 文件时出错
处理 SSI 文件时出错
处理 SSI 文件时出错
2010-8-12 15:32:50PRINT

The Most Advanced Automatic Production Line for Fabrication will Set Up in Henan Province

In April 2010, Zhengzhou Saijin Electric Co., Ltd and ABB Electric Control Equipment Co., Ltd. signed up cooperation agreement and would carry out technical cooperation in medium voltage (MV) electric, automation, GIS etc. After signing, the most advanced automatic production line for fabrication will set up in Zhengzhou City, Henan Province, and Zhengzhou will become world-class manufacturing base for MV switch.

Other information

处理 SSI 文件时出错
处理 SSI 文件时出错